A construction loan pays your builder in stages, and you only pay interest on the amount drawn so far. For NDIA employees building an investment property, the main decision is how the loan structure, the building contract and the tax rules fit together.
This article covers how the loan works, what lenders look at, and what to check before you sign a building contract.
How Does a Construction Loan Work for an Investment Property?
A construction loan releases money in stages as your builder completes work, rather than as one lump sum. Interest is charged on the amount you have drawn at that point, not on the full approved limit.
The number of drawdowns, the repayment type during the build, time limits, inspection requirements, fees and rates are all set by each lender. Ask for these in writing before you commit. Some lenders charge a fee for each progress payment, so add that to your budget.
Our construction loans for public servants page explains the general process. A broker can compare lenders across Australia so the structure suits your build.
Why a Fixed Price Building Contract Matters to Your Lender
A fixed price building contract gives your lender a set total cost and a clear payment schedule, which makes the loan easier to assess. The trade-off is that changes you ask for during the build, called variations, are usually priced on top.
A cost plus contract leaves the final price open, which can make budgeting harder. Some lenders may look at it more closely for that reason.
State laws also shape how you pay your builder. In NSW, the maximum deposit is 10 per cent, and progress payments must match work actually carried out. In Victoria, the deposit cannot be more than 5 per cent for contracts of $20,000 or more. Queensland caps it at 5 per cent for contracts of $20,000 or more, and Western Australia limits it to 6.5 per cent for contracts from $7,500 to $500,000. Check the rules in the state where you are building.
Progress Payments and Drawdowns: What to Expect at Each Stage
Your builder claims a progress payment when a stage is finished, and your lender may arrange an inspection before releasing funds. The stages are normally base, frame, lock-up, fixing and completion, though the names and percentages depend on your contract and state.
In NSW, Building Commission NSW gives $250 to $500 as an indicative cost of each progress inspection arranged by the owner. Lenders may order their own inspections, so ask who pays.
A tight cash flow can catch investors out. NSW Government guidance says a borrower financing a project home must start mortgage repayments once the first progress payment is made and they begin to draw down on the loan. Plan for repayments on the drawn amount while you are still paying rent elsewhere.
Ready to get started?
Book a chat with a Finance and Mortgage Brokers at Public Home Loans today.
Illustrative Example: Building a Rental Dwelling on Land You Already Own
Consider an NDIA employee who owns a block and wants to build a rental home on it. They hold one loan for the land and take a separate construction loan for the build. Their lender uses an illustrative rate of 6.75% p.a. to work out repayments during construction.
Suppose they have drawn $200,000 by frame stage. Interest-only on that amount at 6.75% p.a. is $13,500 a year, or about $1,125 a month. The figure rises as each stage is paid, so the final months cost the most. This is an example only, not a quote. Use our borrowing capacity calculator to test your own numbers.
When the build finishes, the loan can move to a standard investment loan. Many lenders offer this as a construction to permanent loan. Check whether switching costs anything and whether the rate changes.
The outcome is a rental property with a clear cost pattern. The risk is a build that runs over time or budget, which adds interest and delays rent. A buffer in the budget helps.
Do Lenders Test Your Ability to Repay an Investment Build?
Yes. Under APRA's rules, authorised deposit-taking institutions must assess new borrowers at an interest rate at least 3 percentage points above the loan rate. APRA confirmed this buffer was unchanged in May 2026.
For interest-only loans on residential property, lenders must assess serviceability over the period when principal and interest apply, not the interest-only period. That makes the test tougher than the interest-only repayment suggests.
Income type also matters. A prudent lender applies discounts of at least 20 per cent to less stable income such as bonuses or overtime. Lenders set their own income-shading policies, and a broker can confirm how they treat your income.
If you want to know where you stand before you pick a builder, look at getting loan pre-approval.
Construction Loan Interest and Tax: What Is Deductible During the Build?
Interest on a construction loan for a rental dwelling can be claimable, but interest on a loan for vacant land generally is not while the land stays vacant. The ATO gives an example of a buyer with one loan for land and a separate loan for the construction of a house to rent out. Construction loan interest can be claimed in that case, and the land loan interest cannot.
If one loan covers both land and build, the interest has to be split. Once the land is no longer vacant, all of it becomes claimable. Holding costs you cannot deduct may form part of the capital gains tax cost base.
Capital works deductions are generally 2.5 per cent a year for 40 years for residential buildings started after 15 September 1987. Claims start once construction is complete and apply only while the property produces income.
The Australian Government states that new builds can continue to be negatively geared before and after 1 July 2027. Investors who buy new builds can also choose between the existing 50 per cent CGT discount and the new arrangements. Tax outcomes depend on your situation, so speak with your accountant before you commit.
Does the 5% Deposit Scheme or a First Home Grant Apply to an Investment Build?
No. Housing Australia states that investment properties are not eligible for the Home Guarantee Scheme. If you plan to live in the new home yourself, our 5% deposit scheme for public servants page explains the owner-occupier option.
First home owner grants also apply to owner-occupiers. In NSW, the home must be occupied as a principal place of residence for at least 12 continuous months. An investment build will not meet that test.
Setting Up Your Investment Build the Right Way
Sort out your finance structure before you sign a building contract. Lenders may assess the contract, plans, council approval and your income together, so it helps to have each of them in order before the first drawdown.
If this is your first rental, our guide to buying your first investment property covers the wider picture. A registered builder, a fixed price contract and a cash buffer for variations all lower the risk of a stalled build.
Call one of our team or book an appointment at a time that works for you. We will compare construction loan options from lenders across Australia and map out your drawdowns before the first payment falls due.
Frequently Asked Questions
How does a construction loan work for an investment property?
The lender releases funds in stages as your builder completes each part of the build. You pay interest only on the amount drawn so far, and the structure, fees and inspections depend on the lender.
Can I use the 5% Deposit Scheme to build an investment property?
No. Housing Australia states that investment properties are not eligible for the scheme. It is for owner-occupiers who will live in the home.
Is construction loan interest tax deductible on a rental build?
It can be. The ATO says interest on a construction loan for a house to rent out can be claimed, while interest on a land loan generally cannot while the land is vacant. Speak with your accountant about your situation.
Do lenders test my repayments at a higher rate?
Yes. Under APRA's rules, banks must assess new borrowers at a rate at least 3 percentage points above the loan rate. For interest-only loans, the test covers the period when principal and interest apply.